Job Description The EP-ATL-PO section is preparing for the technical challenges of Long Shutdown 3 (2026-2030). During this period, the ATLAS detector will be upgraded with new detector systems requiring active cold and warm cooling, with
Job Description The CERN ATLAS Team plays a major role in the construction of the future silicon ATLAS Inner Tracker (ITk). In particular, the CERN team focuses on the development of the Pixel Outer Barrel, including